When the shower head skims the top of your head, & you can barely move around in the shower because it’s so tiny, & the pipes are exposed- it’s a sure sign that the bathroom needs some remodeling. That’s Dutchs next project, starting as of this week, he will be remodeling areas of the 1st & 2nd floor in the Barn (main guest building). This includes demolishing & revising several guest bedrooms& bathrooms. He has a 5 week time frame to complete this project since the goal is to have this completed before the Pastor Couples Retreat the 3rd weekend in April. This area that he’s remodeling is where we stayed in the Barn for the first 5 weeks that we were here. I made a comment about the shower that if Dutch or I were taller, there is no way we would have been able to put up with it that long. And to demonstrate that, I had Matt Lapp, being 6 ft. & all, stand in the shower (fully clothed, thank you very much), and the shower head came to his mouth. He could have brushed his teeth in there, but beyond that…well…
All jokes aside- this project will probably take every bit of 5 weeks to complete, so we ask that you pray for Dutch as he heads this up. Pray for things to go smoothly from start to finish. And as always, pray that we can be a blessing to every person that helps with this project., whether it’s a hired sub-contractor or someone that volunteers their time. Every encounter with people is an opportunity to be a blessing!!
No comments:
Post a Comment